INSTALLATION – OPERATION – MAINTENANCE
8. MAINTENANCE INTERVALS - USER / TECHNICIAN
Notice!
The operating entity is obliged to ensure that all tests of the equipment are carried out
repeatedly at least once within every 24 months (EN 62353) or in intervals as specified
by the applicable national legal regulations. A report must be prepared on the results
of the tests (e.g.: according to EN 62353, Annex G), including the measurement
methods used.
Maintenance to be done
Use of antifoaming tablets
Inlet Sieve Cleaning
Lubricating seals and sliding clamps
Disinfection of Tubings and Separation
Vessel
Cleaning and disinfection of the exterior
surfaces of the product
Replacement of output pre-filter
Replacement of output filter
Exchange of suction cannula
Replacing the filter in the separation
vessel
Perform "Repeated Test" according to
EN 62353
9. MAINTENANCE, CLEANING AND DISINFECTION
Repair works exceeding the scope of a general maintenance may only be carried out
by a qualified specialist or by the maufacturer's customer service.
Use only spare parts and accessories permitted by the maufacturer.
Before making any maintenance, repair or cleaning, it is unavoidable to disconnect
the equipment from the network (unplug).
Allow the equipment to cool down before maintenance and service!
Reconnect the grounding lead if removed during service work to its previous
location once the work is complete.
Following works must be carried out from the hygiene and the correct aspirator function points of view.
9.1. Inlet Sieve Cleaning
Solid particles (sucked together with a liquid component and the air) are entrapped in the inlet sieve
(7) during the equipment operation (Enclosure No. 1, Fig. 1) which therefore must be regularly
cleaned, by section 8 (though, always at the end of each shift).
The inlet sieve cleaning is possible only after the moisture inside suction tubings (6) and a sieve is
reduced by means of the several seconds lasting air suction through tubings taken off the holder (2).
Then turn the power-supply switch (5) off in the position „O" and slightly lift the cover of the inlet sieve.
Afterwards pull the sieve out of its place gripping the holder, remove solid particles and clean the
sieve. Then put the sieve on the previous place into the holder and carry out the assembly in the
contrary manner to the dismantling.
If the suction of amalgam particles is expected, it is necessary to empty the inlet sieve content into a
closing vessel and forward it to the collecting centres.
NP-DO M-34_03-2019
Chapter
Time interval
7.2
9.1
9.2
Every 15 days
9.3
9.4
9.5
every 3 months
9.6
max. 100 steam cleaning cycles
9.7
9.8
Every 18 months
8
1x in 2 years
- 13 -
ASPINA DO M
To be
performed by
at need
per day
per day
at need
per annum
user
user
User
user
user
user
user
user
User
qualified
technician