The pipe installation is to be carried out according to
the diagram below. The enclosed T-joint is mounted
as shown in the picture under "Component positions"
at positions (A) and (B). The installation should be
done so that vibrations are not transferred from the
heat pump to the cooling module via the pipes and
onward.