Herunterladen Inhalt Inhalt Diese Seite drucken

dirna Bergstrom LITE Diagnose Bei Ausfällen Seite 25

Vorschau ausblenden Andere Handbücher für LITE:
Inhaltsverzeichnis

Werbung

Verfügbare Sprachen
  • DE

Verfügbare Sprachen

  • DEUTSCH, seite 42
LITE
• Verify the load by checking the pressure; if it is below 0.5 bars or above 5.0 bars
with the unit running, restore the load and vacuum deair for at least 30 minutes
and introduce 250 g.
• Clean the condenser with pressurised air.
• Connect or replace the condenser fan.
• Check the pressure; if it is below 0.5 bars with the unit running, clean the circuit or
replace the obstructed components (possibly the continuous flow capillary pipe).
* In many cases, gas recovery will not be exact since part of the gas remains in
the recovery circuit.
Solution
25
EN
®

Werbung

Inhaltsverzeichnis
loading

Inhaltsverzeichnis