Kröber O2 - Kröber O2 Vers. 4.0
Taking into service
7 Taking into service
7.1 Before assembling
Check before assembling whether all components needed for correct operation are available.
NOTE!
Contact the manufacturer or the local service provider if help is needed during
operation or maintenance. The address of the manufacturer can be found on page 57.
The a.m. organisations should also be contacted in case of unexpected events or
incidents.
NOTE!
After unpacking the device, the transport or storage temperature may have to be
adjusted to the operating temperature. Before switching on, the waiting times according
to Chapter 6.3 (Acclimatization times) must be observed.
Fig. 5 Scope of delivery 1
1
Fig. 6: Scope of delivery 2
70
3
4
2
Unit:
• Unit Kröber O2
• User manual
Further components:
1 Coarse dust filter
2 Humidifier
TM
3 FireSafe
check valve
4 Angular connector
EN