Herunterladen Inhalt Inhalt Diese Seite drucken

Bruker S8 TIGER Originalbetriebsanleitung Seite 36

Inhaltsverzeichnis

Werbung

Verfügbare Sprachen

Verfügbare Sprachen

Introductory User Manual
S8 TIGER X-ray Spectrometer
Ideally the unit is located on the same floor as your spectrometer. Otherwise you need to take into
account the required additional pump pressure. It might be required for the water to overcome the
resulting pressure difference due to the height difference. Also observe the maximum allowed tubing
length of the chiller chosen (consult the chiller's manual).
Fig. 1-9:
Closed loop cooling system.
1-22
DOC-M80-ZXX031 V4 – 02.2010

Werbung

Inhaltsverzeichnis
loading

Inhaltsverzeichnis