3.2 Display

INFORMATION
It may take some time until the display responds after
switching on.
The integrated display on the inverter front gives the user
access to information about the inverter.
Figure 3.1 Overview of display buttons and functionality
Display buttons and functionality
Button
F1
F2
F3
F4
Home
OK
Up arrow
Down arrow
Arrow right
Arrow left
Back
Installation Manual
Function
Adjust the contrast level of
display. Use arrow up/down
button while pressing the F1
button.
No function
Return to main screen
No function
A step up
A step down
Toggles screen right
Toggles screen left
Return to main screen
Button
On – green LED
Alarm – red LED
Table 3.2 Display with control and function buttons
The screen design is divided into different sections:
1. Main screen. Current and daily yield.
This section contains:
– Actual output power (kW)
– Daily energy (kWh)
– Total energy (kWh)
– Current date
– Current time
– Operating mode (#)
2. Inverter information. This section contains:
– Inverter device type
– Inverter name
– Inverter serial number
– IP address
– Serial number of the SMA Inverter Manager
– Software version of the inverter
3. Actual values This section contains:
– DC voltage and current
– Phase-to-phase voltages
– Phase currents
– Grid frequency

3.2.1 Initial Setup via LCS Tool

The inverter and the SMA inverter manager must be
commissioned via the local commissioning and service tool
(LCS-Tool). Commissioning is necessary before the inverter
is connected to the AC utility grid and feed-in operation
begins.
The LCS too enables the selection of predefined country
data sets for different utility grids. Customer-specific country
data sets can be provided by SMA and imported via the
LCS tool (see installation manual of the SMA Inverter
Manager / LCS Tool).
After installation, check all cables and close the inverter.
Turn on AC power.