3. Hook the roof anchor (03A) over the fixing batten in
line with a tile valley and fix in place with a screw
(16-B).
The side by side positioning of the roof an-
chors is dependent upon the tile valleys.
4. Fix all remaining roof anchors in the same manner.
The roof anchors are fitted at uniform intervals de-
termined over the full length of the fixing batten.
Roof anchor spacing:
see chapter 4.1 Dimensions of and spacings be-
tween roof anchors, page 10
The roof anchors should be aligned flush
horizontally and vertically (follow roof-tile
valleys).
5. Replace the roof tiles top and bottom.
6. Check the distance and fit an extension profile on
the lower roof anchor where necessary.
To do this:
Remove the hammerhead screw from the roof an-
chor,
Fasten the roof anchor extension to the profile with
M8 x 20 cheese-head bolts, washers and nuts
Then fit the hammerhead screw into the corre-
sponding slotted holes