8.6
Exchange of signals (extract of the circuit diagram)
The following signals are available for signal exchanges with a control unit on the
customer's end :
Ecolab => customer:
Customer => Ecolab: External metering lock (see chapter 8.5)
Fig. 8.16
8.7
Start-up
• Testing and start-up of all the installations (see chapter 7)
• Testing the cabling which is installed externally (see chapter 6.3) and connections,
acc. to the circuit diagram
• Switching on the voltage supply by pressing the mains master switch
• I/O signal test for signals fed in externally (see chapter 8.6)
• Inputting and testing the parameter settings (see chapters
• Start "Automatic mode" by selecting it in the "operating level" on the operator panel
=> the water-inlet valve is opened, the
PLUS
Oxy-Gen
417101630_OxyGen Plus.doc
PLUS
Oxy-Gen
PLUS
Oxy-Gen
PLUS
Oxy-Gen
day container is filled.
Oxy-Gen
production unit warning (see chapter 10.2)
production unit fault (see chapter 10.2)
day container fault (see chapter 10.2)
PLUS
Oxy-Gen
production unit produces ClO
- 88 -
PLUS
8.5
and 8.8)
2
and the
1-04/09