Herunterladen Diese Seite drucken

Bosch AEC-PANEL19-UPS Installationshandbuch Seite 10

Montageblech für amc2, pbc-60 und akkus

Werbung

Verfügbare Sprachen
  • DE

Verfügbare Sprachen

10
en
6.
7.
NOTICE!
i
Connect readers and contacts in accordance with the AMC2
installation guide (Order-No.: F.01U.028.714).
DANGER!
Before connecting the power supply, remove the fuse on the 3-
pole connector (1)!
Do not replace the fuse until the connection process has been
completed.
8.
CAUTION!
Trim the external power cables such that the earth wire (yellow/
!
green) is at least 2cm (8/10") longer than the live wire (brown).
This will ensure that, if the wires are accidentally pulled, that
the voltage carrying wires will be disconnected first.
9.
F.01U.097.256 | V 1.1 | 2008.12
e.
Connect the B2a plug (black) to the negative terminal
of the second battery.
f.
The ends B3a and B3b remain unused. Due to the pre-
mounted connector no further insulation is necessary.
Connecting the temperature gauge using cable set F:
a.
Connect the 2-pole plug F1 to the socket marked RTH
on the PBC-60 power supply.
b.
Fix the cable with cable tie D to the fastener E, in such
a way that the temperature gauge F2 is located close
to the batteries.
Connecting a further AMC-Device (here, as an example, an
AMC2-16I-16O-EXT):
a.
Connect the RS485 slave interface of the second AMC
device to the RS485 slave interface of the AMC2
marked RS-485EXT.
b.
Connect the data lines (pins 3 and 6) as well as the
power lines (pins 1 and 2).
Connecting the power supply:
a.
Clamp the neutral wire (blue) in the left screw
terminal marked N on the mounting plate.
b.
Clamp the live wire (brown) in the right hand terminal
marked L1.
c.
Attach the earth wire (yellow/green) to the mounting
plate with the screw to the left of the clip.
Mount the mounting plate in the 19" rack using the G1
screws and the G2 cage nuts.
AEC-PANEL19 - Installation manual
Bosch Sicherheitssysteme GmbH

Werbung

loading

Diese Anleitung auch für:

Aec-panel19-4dr