Herunterladen Inhalt Inhalt Diese Seite drucken

Installing The Integrated Opening End Stop - SOMFY AXOVIA 220B Installationsanleitung

Vorschau ausblenden Andere Handbücher für AXOVIA 220B:
Inhaltsverzeichnis

Werbung

Verfügbare Sprachen
  • DE

Verfügbare Sprachen

  • DEUTSCH, seite 19
Axovia 220B
6) To ensure the gate is closed correctly, push the motor arm and the
gate firmly:
- the gate arm must be fully deployed,
- the mounting tab must be flat against the reinforcement,
- the gate arm marking must be aligned with the motor arm arrow.
Ensure the markers on the motor arm and the gate arm are
lined up to ensure the gate is properly closed and can with-
stand strong winds or external forces.
7) Mark the centre-to-centre distances for mounting the bracket to the
gate.
8) Remove the gate arm.
9) Drill the gate leaf reinforcement.
10) Mount the bracket.
Copyright © 2017 SOMFY ACTIVITES SA. All rights reserved.
11) Put the gate arm back into position.
Check that the position of the bracket on the gate is correct by manually
opening the gate.
If necessary, correct the position.
6. INSTALLING THE INTEGRATED OPENING
END STOP
1) Manually open the gate to the opened position required.
2) Install the end stop on the bracket side, flush against the shoulder of
the motor arm.
Do not tighten the end stop.
3) Close the gate slightly.
4) Move the end stop approximately 2 mm towards the motor arm shoul-
der.
EN
α
max
2mm
6

Werbung

Inhaltsverzeichnis
loading

Inhaltsverzeichnis