Contents
1
General information
2
General safety information
2.1
2.2
2.3
3
4
5
6
7
8
8.1
8.2
9
10
11
11.1
11.2
11.3
12
13
14
15
16
17
18
19
1
General information
Prerequisites to ensure that the GEMÜ pilot
16
solenoid valve functions correctly:
16
Correct transport and storage
Installation and commissioning by trained
17
personnel
17
Operation according to these installation,
18
operating and maintenance instructions
18
Recommended maintenance
18
Correct installation, operation, servicing and
18
repair work ensure faultless pilot solenoid
19
valve operation.
20
21
The descriptions and instructions
21
apply to the standard versions.
21
For special versions not described
21
in these installation, operating
21
and maintenance instructions the
21
basic information contained herein
22
applies in combination with any
24
additional special documentation.
27
27
All rights including copyright
28
and industrial property rights are
28
expressly reserved.
28
28
2
General safety information
29
The safety information in these installation,
operating and maintenance instructions
29
refer only to the individual pilot solenoid
29
valve itself. Potentially dangerous conditions
can arise in combination with other plant
components, which need to be considered
on the basis of a risk analysis.
The operator is responsible for the
production of the risk analysis and for
compliance with the resulting precautionary
measures and regional safety regulations.
The safety information does not take into
account:
Unexpected incidents and events, which
may occur during installation, operation
and servicing.
Local safety regulations which must be
adhered to by the operator and by any
additional installation personnel.
16/32
0322, 0324, 0326