Herunterladen Inhalt Inhalt Diese Seite drucken

Prior To Operation - Hitachi WR 12DM2 Bedienungsanleitung

Akku-schlagschrauber variable speed
Vorschau ausblenden Andere Handbücher für WR 12DM2:
Inhaltsverzeichnis

Werbung

Verfügbare Sprachen
  • DE

Verfügbare Sprachen

  • DEUTSCH, seite 20
(2) Regarding the temperatures of the rechargeable battery
The temperatures for rechargeable batteries are as
shown in the table below, and batteries that have
become hot should be cooled for a while before
being recharged.
Table 6 Recharging ranges of batteries
Rechargeable batteries
EB1220BL, EB9B
EB1226HL, EB1230HL, EB926H, EB930H
(3) Regarding recharging time
Depending on the combination of the charger and
batteries, the charging time will become as shown in
Table 7.
Table 7 Charging time (At 20°C)
Charger
Battery
EB1220BL, EB9B
EB1226HL, EB926H
EB1230HL, EB930H
NOTE:
The charging time may vary according to the ambient
temperature and power source voltage.
4. Disconnect the charger's power cord from the receptacle.
5. Hold the charger firmly and pull out the battery.
NOTE:
Be sure to pull out the battery from the charger after
use, and then keep it.
Regarding electric discharge in case of new
batteries, etc.
As the internal chemical substance of new batteries
and batteries that have not been used for an extended
period is not activated, the electric discharge might
be low when using them the first and second time.
This is a temporary phenomenon, and normal time
required for recharging will be restored by recharging
the batteries 2 – 3 times.
How to make the batteries perform longer
(1) Recharge the batteries before they become completely
exhausted.
When you feel that the power of the tool becomes
weaker, stop using the tool and recharge its battery.
If you continue to use the tool and exhaust the electric
current, the battery may be damaged and its life will
become shorter.
(2) Avoid recharging at high temperatures.
A rechargeable battery will be hot immediately after
use. If such a battery is recharged immediately after
use, its internal chemical substance will deteriorate,
and the battery life will be shortened. Leave the battery
and recharge it after it has cooled for a while.
CAUTION:
If the battery is charged while it is heated because it
has been left for a long time in a location subject to
direct sunlight or because the battery has just been
Temperatures at
which the battery
can be recharged
–5°C – 60°C
0°C – 45°C
UC14YFA
Approx. 50 min.
Approx. 65 min.
Approx. 70 min.
used, the pilot lamp of the charger lights up green. In
such a case, first let the battery cool, then start
charging.
When the pilot lamp flikers in red quickly (at 0.2-
second intervals), check for and take out any foreign
objects in the charger's battery installation hole. If
there are no foreign objects, it is probable that the
battery or charger is malfunctioning. Take it to your
Authorized Service Center.
Since the built-in micro computer takes about 3
seconds to confirm that the battery being charged
with UC14YFA is taken out, wait for a minimum of 3
seconds before reinserting it to continue charging. If
the battery is reinserted within 3 seconds, the battery
may not be properly charged.

PRIOR TO OPERATION

1. Preparing and checking the work environment
Make sure that the work site meets all the conditions
laid forth in the precautions.
2. Checking the battery
Make sure that the battery is installed firmly. If it is at
all loose it could come off and cause an accident.
3. Installing the bit (WH12DM2, WH9DM2, WH12DMR)
Always follow the following procedure to install driver
bit. (Fig. 4)
(1) Pull the guide sleeve away from front of the tool.
(2) Insert the bit into the hexagonal hole in the anvil.
(3) Release the guide sleeve and it returns to its original
position.
CAUTION:
If the guide sleeve does not return to its original
position, then the bit is not installed properly.
4. Selecting the socket matched to the bolt
(WR12DM2, WR9DM2)
Be sure to use a socket which is matched to the bolt
to be tightened. Using an improper socket will not
only result in insufficient tightening but also in
damage to the socket or nut.
A worn or deformed hex. or square-holed socket will
not give an adequate tightness for fitting to the nut or
anvil, consequently resulting in loss of tightening
torque.
Pay attention to wear of socket hole, and replace
before further wear has developed.
Finally, install the socket prescribed in Item 5. The
section on "Optional Accessories" details the
relationship between bolt sizes and sockets. Sockets
are named according to the dihedral width of the
hexagonal hole.
5. Installing a socket (WR12DM2, WR9DM2)
Select the socket to be used.
Pin, O-ring type (Fig. 5 and 6)
(1) Align the hole in the socket with the hole in the anvil
and insert the anvil into the socket.
(2) Insert the pin into the socket.
(3) Attach the ring to the groove on the socket.
Plunger type (Fig. 7)
Align the plunger located in the square part of the
anvil with the hole in the hex. socket. Then push the
plunger, and mount the hex. socket on the anvil.
Check that the plunger is fully engaged in the hole.
When removing the socket, reverse the sequence.
English
12

Werbung

Inhaltsverzeichnis
loading

Diese Anleitung auch für:

Wh 12dm2Wh 9dm2Wh 12dmrWr 9dm2

Inhaltsverzeichnis