Herunterladen Inhalt Inhalt Diese Seite drucken

Harrie Leenders Cylon Anleitung Und Montageanleitung Seite 21

Vorschau ausblenden Andere Handbücher für Cylon:
Inhaltsverzeichnis

Werbung

Verfügbare Sprachen
  • DE

Verfügbare Sprachen

7. Air supplied through the floor
• Ensure that the stove is positioned properly over the hole in the floor.
(at least 100 mm and at most 125 mm cross-section)
• Place the small pipe, supplied with the stove, between the adapters
in the base.
• Fix it with a self-tapping screw.
• Fill up any gaps between the base and the floor using Compriband strip.
9. Fastening the base finishing cover
• Open the air-control slide.
• Start on the right-hand side by placing the finishing cover behind
the air-control-slide handle and turn the cover to the left.
• Push the cover into place.
• Then fit the back of the finishing cover.
8. Loading and zero position
• To ensure that the stove does not turn when being loaded, the Cylon
has a loading and a zero position.
• These can be adjusted using the nut and bolt in the base, left side.
• By tightening them (further), the stove will 'run' less smoothly (there
are then 2 clicking positions, one straight stove-front position
and one loading position).
• It is possible to remove the loading and zero position.
10. Removing the self-closing door (optional)
• Remove both socket-head bolts at the top of the door.
GB 19

Werbung

Inhaltsverzeichnis
loading

Inhaltsverzeichnis