Herunterladen Inhalt Inhalt Diese Seite drucken

Eaton 9910-P64 Installationsanleitung Seite 22

Inhaltsverzeichnis

Werbung

Verfügbare Sprachen
  • DE

Verfügbare Sprachen

INSTALLATION
5.
6.
7.
8.
9.
The UPS chassis (
are required to lift the cabinets into the rack.
NOTE The EBMs must be installed below the UPS as shown in Figure 7.
10. Slide the UPS and any optional cabinets into the rack.
11. After installing the UPS chassis, secure the front of the UPS to the
8
EATON Powerware
Repeat Steps 3 and 4 for the other rail.
Tighten the assembly wing nuts on both rail assemblies.
Place the UPS on a flat, stable surface with the front of the UPS
facing toward you.
Align the mounting brackets (provided in the rack mounting bracket
kit) with the screw holes on the side of the UPS and secure with
×
the supplied #6-32
3/8" flat-head screws (see Figure 6).
If installing an optional cabinet, repeat Steps 7 and 8 for each
cabinet.
Mounting
Bracket
Figure 6. Installing the Mounting Brackets
82 lb/37.2 kg) and
rack using two hex-head screws in the top and bottom positions of
each mounting bracket (see Figure 7). Repeat for each cabinet.
®
9125 (9910-P64) UPS Installation Guide for IBM
C A U T I O N
EBM (
169 lb/76.7 kg)
are heavy. A minimum of two people
®
S
Applications
164201637 Rev A

Werbung

Inhaltsverzeichnis
loading

Diese Anleitung auch für:

Powerware 9125

Inhaltsverzeichnis