Herunterladen Inhalt Inhalt Diese Seite drucken

Hydraulic Systems - Riello G10 type 464T1 Montage- Und Bedienungsanleitung

Vorschau ausblenden Andere Handbücher für G10 type 464T1:
Inhaltsverzeichnis

Werbung

Verfügbare Sprachen
  • DE

Verfügbare Sprachen

  • DEUTSCH, seite 1

HYDRAULIC SYSTEMS

Warning: before starting the burner make sure that the return pipe-line is not clogged: any obstruc-
tion would cause the pump seals to break.
WARNING
The pump is supplied for use with a two pipe system.
For use on a one pipe system, it is necessary to remove the by-pass
screw (A), (see figure).
SYSTEM NOT PERMITTED IN GERMANY
D5219
H = Difference of level.
L = Max. length of the
suction line.
I.D.= Internal diameter of the
oil pipes.
D5220
A filter must be installed on the suction fuel line.
2351
H
meters
0.5
1
1.5
2
PRIMING THE PUMP
Loosen the plug of the vacuum gauge (5, fig. 1) and
wait until the fuel flows out.
L meters
H
I. D.
I.D.
meters
8 mm
10 mm
0
35
100
0.5
30
100
1
25
100
1.5
20
90
2
15
70
3
8
30
3.5
6
20
4
GB
L meters
I. D.
I.D.
8 mm
10 mm
10
20
20
40
40
80
60
100
The pump vacuum should not exceed a
maximum of 0.4 bar (30 cm Hg).
Beyond this limit gas is released from
the oil.
Oil lines must be completely airtight.
The return line should terminate in
the oil tank at the same level as the
suction line; in this case a non-return
valve is not required.
When the return line arrives over the
fuel level, a non-return valve must be
used.
This solution however is less safe than
previous one, due to the possibility of
leakage of the valve.
PRIMING THE PUMP
Start the burner and wait for the priming.
Should lock-out occur prior to the arrival
of the fuel, await at least 20 seconds
before repeating the operation.
A
D5199

Werbung

Inhaltsverzeichnis
loading

Inhaltsverzeichnis