Herunterladen Inhalt Inhalt Diese Seite drucken

Melitta CAFFEO SOLO & perfect milk Bedienungsanleitung Seite 78

Kaffeevollautomat
Vorschau ausblenden Andere Handbücher für CAFFEO SOLO & perfect milk:
Inhaltsverzeichnis

Werbung

Verfügbare Sprachen
  • DE

Verfügbare Sprachen

  • DEUTSCH, seite 1
Phase 4
During Phase 4, three bean symbols
middle bean will be flashing.
→ The integrated cleaning programme continues. This process lasts
approximately 5 minutes. Water flows out of the outlet as well as in the
interior of the appliance into the drip tray. Subsequently, the symbol for the
drip tray
18 Empty the drip tray and the coffee grounds container and then reinsert
them.
→ The standby symbol
The appliance is ready for operation.
76
illuminates.
will be illuminated after a brief heat-up phase.
are shown on the display. The

Quicklinks ausblenden:

Werbung

Inhaltsverzeichnis
loading

Inhaltsverzeichnis