Herunterladen Inhalt Inhalt Diese Seite drucken

Maintenance; Warranty; Service Addresses - Speck-Pumpen VGX Originalbetriebsanleitung

Inhaltsverzeichnis

Werbung

Verfügbare Sprachen

Verfügbare Sprachen

8

Maintenance

NOTICE
Before maintenance work, close all shut-off valves and drain
all pipes.
When?
Regularly
If there is a chance of
frost
After completing all maintenance work, perform all necessary
measures for start-up.
8.1

Warranty

The warranty includes the devices delivered and all components.
However natural wear and tear (DIN 3151/DIN-EN 13306) on all
turning and dynamically loaded components, including electronic
components under tension, is not covered under the warranty.
Failure to comply with the safety instructions may void the
warranty.
8.2

Service addresses

Service addresses can be found on our website
pumps.com.
05|2017
What?
Check running noises.
Check the pump for leaks.
Drain pump and pipes sensitive
to frost in good time.
Maintenance
www.speck-
EN 23

Werbung

Kapitel

Inhaltsverzeichnis

Fehlerbehebung

loading

Diese Anleitung auch für:

2vgxMtx

Inhaltsverzeichnis