Herunterladen Inhalt Inhalt Diese Seite drucken

Mounting Canopy Hood Above An Island; Disposal Of Packaging And Appliance; Technical Specifications - Pelgrim LSK 988 Anleitung

Wandhauben
Vorschau ausblenden Andere Handbücher für LSK 988:
Inhaltsverzeichnis

Werbung

Verfügbare Sprachen

Verfügbare Sprachen

Mounting the canopy hood above
an island
4
3
5
1
2
6
Make sure that the ceiling is suitable for the
suspension of the construction chimney.
First determine the position and distance
with regard to the chimney. Make a 160 mm
hole in the ceiling for the duct.
If the opening for the flex (bottom of the
chimney construction 1) is pointed towards
you, then the control switches will be to
your right.
Drill four 10 mm holes for the plugs and
screw the chimney against the ceiling.
If the hood is to be connected to a 125 mm
diameter flue pipe, the 150/125 mm
adapter (2) must first be attached to the
motor group using 2 screws.
Slide the inner cylinder (3) over the
chimney construction up to the ceiling and
fix it with 2 screws (4). Then slide the outer
cylinder (5) on.
Fix the canopy hood to the chimney
construction with the 4 M6 screws (6).
Make the electrical connection and
observe the flex opening (1).
Now fix the outer cylinder (5) to the cooker
hood with 2 screws, this is done from the
inside of the cooker hood.
Remove the film from the filters.
Disposal of packaging and
appliances
The packaging of the appliance is recyclable.
It is made up off:
– cardboard
– polyethylene
– CFC free polystyrene (PS rigid foam)
– polypropylene straps around the box
Please dispose of these materials in a
responsible way in accordance with the
regulations of your local authority.
Your local authority will also be able to give
you information about disposing disused
household appliances in a responsible way.

Technical specifications

See identification plate for technical
specifications.

Werbung

Inhaltsverzeichnis
loading

Inhaltsverzeichnis