Herunterladen Inhalt Inhalt Diese Seite drucken

Commissioning; Initial Start-Up; Appliance Handover - STIEBEL ELTRON DHM 3 Installation

Vorschau ausblenden Andere Handbücher für DHM 3:
Inhaltsverzeichnis

Werbung

Verfügbare Sprachen
  • DE

Verfügbare Sprachen

  • DEUTSCH, seite 1
INSTALLATION

Commissioning

Material losses
!
Take note of the type plate. The specified voltage must
match the mains voltage.
f Connect the power cable as shown in the wiring diagram
f
(see chapter "Specification / Wiring diagram").
26
| DHM
5.
Commissioning
5.1

Initial start-up

f Fill the appliance by running the tap several times until the
f
pipework and appliance are free of air.
f Carry out a tightness check.
f
f Insert the power cable plug, if present, into the standard
f
safety socket or set the fuse/MCB.
f Check the function of the appliance.
f
5.2

Appliance handover

f Explain the appliance function to users and familiarise them
f
with its operation.
f Make users aware of potential dangers, especially the risk of
f
scalding.
f Hand over these instructions.
f
www.stiebel-eltron.com

Quicklinks ausblenden:

Werbung

Inhaltsverzeichnis
loading

Diese Anleitung auch für:

Dhm 4Dhm 6Dhm 7

Inhaltsverzeichnis