7. Maintenance, repair and cleaning
Place the pressure frame over the mica shield and centre
Carry out the mounting as described in chapter 5.2 "Mounting of
models LGG-R, LGG-T, LGG-M"
Seat the cover back via the threaded studs
Carry out the leak test
EN
Following successful repair, recommission the sight glass level indicator,
see chapter 5.2 "Commissioning".
Replacing the glass tube with model LGG-G
Depressurise the vessel
Close the lower and then the upper valve head
Open the drain valve and allow the media to drain
Remove protective devices, if present
Remove the damaged glass tube and sealings
Insert new sealing plugs
For mounting, see chapter 5.3 "Mounting of model LGG-G"
Carry out the leak test
Following successful repair, recommission the sight glass level indicator,
see chapter 5.2 "Commissioning".
Replacing the valve head
A valve head can only be replaced after the sight glass level indicator
has been isolated from the process. If necessary, the indicator must be
removed from the vessel.
It is recommended that the repair of valves is carried out by the
manufacturer.
Repair work by the plant operator should only be carried out by trained,
skilled personnel, who have proven experience in such work. Following
the completion of the work, the functional safety of the shut-off devices
must be ensured by the plant operator on their own responsibility.