Installation
Wall mounting
400
Diagram
Installation on a stratification
cylinder
Threaded sleeves
3064341_201505
Freshwater module installation instructions
Positioning and installation may only be carried out by an authorised contractor.
The system must be installed in a location that is protected from frost.
Use the fixing materials included with the unit for wall mounting
(2 x M10 x 120 double-ended screws + 2 x M10 nuts + 2 x M10 washers).
Drill 12 mm diameter holes to a depth of around 7 cm at the positions shown
in the diagram.
Next, insert rawl plugs into the drilled holes and insert the double-ended
screws into the rawl plugs until the threads are no longer visible. Next hang the
FWS-2-60 onto the threaded studs and secure it using the nuts and washers.
When installing the FWS-2-60 freshwater module on a cylinder, and when in-
stalling BSP-MK circuits with mixers at the same time, these circuits must be
installed and connected to the pipework first.
Use the mounting hardware supplied with the system (2 x M10 x 100 threaded
studs + 2 x M10 nuts + 2 x M10 washers) to install it on a stratification cylinder.
After installing the buffer cylinder insulation, turn the threaded studs about 5 mm
into the threaded sleeves located on the cylinder.
Use the corrugated pipe cylinder connection set, a secure and time-saving
connection, for installing the system on stratification cylinders.
15