Herunterladen Inhalt Inhalt Diese Seite drucken

Connecting To The Internal Distribution Box - Bosch BPT-S Hybrid Installationsanleitung

Inhaltsverzeichnis

Werbung

Verfügbare Sprachen

Verfügbare Sprachen

English
Bosch Power Tec GmbH
The battery converter (1)
6.17:
The battery converter is installed.
6.8.2

Connecting to the internal distribution box

Procedure
1. Remove the cover from the internal distribution
box
2. Connect the 2-core backup cable (1) to the
bottom terminals 5 and 6 on the internal
distribution box (M20)
3. Connect the 4-core intermediate circuit cable (DC
link) (2) to the bottom terminals 1-4 on the
internal distribution box (M25)
Installation | 77
(1)
Storage system | Installation manual

Werbung

Inhaltsverzeichnis

Fehlerbehebung

loading

Inhaltsverzeichnis