The maximum
height from the
upper edge of the
base plate to the
upper edge of the
lift rails must not
exceed 695 mm.
If improper settings are done on the
potentiometer, this can lead to mal-
functioning of the lift and even to dan-
ger for life and limb and permanent
damage to the lift and the vehicle on
it.
• Remove the operating unit on the operating col-
umn.
• If potentiometer 3 (for "Up Off") is turned an-
ti-clockwise, the upper holding point is moved up-
wards and the lift stops later in the lifting process.
• If the potentiometer 3 (for "Up Off" is turned
clockwise, the upper holding point is moved
downwards and the lift stops earlier in the lifting
process.
• If potentiometer 4 (for "Down Off") is turned an-
ti-clockwise, the lower holding point is moved
upwards and the lift stops earlier in the lowering
process.
• If the potentiometer 4 (for "Down Off") is turned
clockwise, the lower holding point is moved
downwards and the lift stops later in the lowering
process.
In the following alignment work it must be abso-
i
lutely ensured that a block movement of the lift
is prevented. The potentiometer for the "Up or
Down Off" may only be fine-adjusted, meaning
the potentiometer is slightly adjusted, then the
lift is actuated. Repeat the procedure until the
desired end point of the lifting rails is reached.
OPI_SMART LIFT 2.30 SL-2.35 SL-2.40 SL_V3.4_DE-EN-FR-ES-IT
7
Maintenance and care of the lift
Before maintenance, do all prepa-
ration work so there is no danger to
life or limb or object damage during
maintenance and repair work.
Legal principles: BSV (operating
equipment regulation) + BGR500 (Op-
eration of work equipment)
Value is placed on long lifetimes and safety in the
development and production of Nussbaum prod-
ucts. To guarantee the safety of the operator, prod-
uct reliability, low running costs, keep the warranty
and also the long-lifetime of the product, proper
set up and operation is just as important as regular
maintenance and sufficient care.
Our platforms fulfil or exceed all safety standards of
the countries we supply to. For example, Europe-
an regulations require a service by qualified experts
every 12 months of work of the platform. To guar-
antee the largest possible availability and function-
al capacity of the lift system, ensure the list of any
cleaning, care and maintenance work is done.
After first commissioning the lift is to be serviced at
regular intervals of a maximum of one year by an
authorized person according to the following plan.
For intensive operation and higher degree of con-
tamination shorten the service interval.
The complete function of the lift is to be observed
during daily use. Customer service must be in-
formed of any malfunctions.
Lubrication and maintenance sticker on the lift
column
1
2,C
2
3,A
3
3,D
3,D
4
3,C
5,A
6,A
5
1,A
6,C
5,C
6
Descriptions: e.g.
1B = Lubricate with a multi-purpose grease semi-annually.
5C = Clean monthly with compressed air
1
2,C
2
3,A
3
3,D
3,D
4
3,C
5,A
6,A
5
1,A
6,C
5,C
6
A
12 1
3,A
1,A
11
4,A
10
1x/12
9
8
7
6
B
12 1
11
6,C
10
4,A
2,B
2x/12
9
4,C
8
7
6
C
12 1
11
10
12x/12
9
6,C
3,D
5,C
8
5,B
7
6
D
12 1
1,A
2,B
11
3,A
10
365x/12
9
8
4,A
7
6
A
12 1
3,A
1,A
11
4,A
10
1x/12
9
8
7
6
B
12 1
11
6,C
10
4,A
2,B
2x/12
9
4,C
8
7
6
C
12 1
11
10
12x/12
9
6,C
3,D
5,C
8
5,B
7
6
D
12 1
1,A
2,B
11
3,A
10
365x/12
9
8
4,A
7
6
2
3
4
5
2
3
4
5
2
3
4
5
2
3
4
5
2
3
4
5
2
3
4
5
2
3
4
5
2
3
4
5
105