Assembly Instructions
Unpacking and Operation
Beore usage, observe our recommendations and saety in-
structions.
Step 1:
Remove the treadmill (1).
Remove small parts, loose packing material out o the box and
then take out with help o a second person the preassembled
rame o packaging. Put your hands below the main rame (1) and
take care o no squeezing.
Step 2:
Unolding the support tubes (3+4)
Fold up the supports let and right (3+4) with care and lock up the
upright position o supports (3+4) by screw in the support screws
(30). (Make sure that the lock engages each other.)
Step 3:
Positioning the handles (6+7) and the computer (5).
ATTENTION: When assembly the hand bar, please attention the
hole on the hand bar is downward.
1. Put the let handle (6) in the direction as shown on the picture.
Use small rotary knob (57) with Isolation nylon pad (34) to lock the
handle tightly.
2. Right side same as let side. As shown on the picture.
3. Ater using or a time, i the handle is loose, please asten the
rotary knob (57) again.
4. Flip the computer (5) until the positioning pin (62) pops in.
15