Herunterladen Diese Seite drucken

Hayward Powerline classic Einbau- & Anleitungshandbuch Seite 54

Werbung

Verfügbare Sprachen
  • DE

Verfügbare Sprachen

  • DEUTSCH, seite 132
6. APPENDICES (continued)
6.2 Heating priority connections Single-Phase Pump
Dry contact 7 A max
OUT2
Power supply
230V
/ 50Hz
Monophasic pump
Terminals 1 and 2 deliver a potential-free dry contact,
230 V
/ 50 Hz, no polarity.
Wire terminals 1 and 2 as indicated in the diagram
above, to activate the operation of the filtration pump
in 2-minute cycles each hour if the temperature of the
pool is lower than the set point.
Never connect the power supply of the filtration
pump directly to terminals 1 and 2.
18

Werbung

loading