8. ASSEMBLY
Before assembling, check that the product is complete and has not suffered any damage
during transport.
ASSEMBLY must be carried out by a specialised company.
For the system to function as intended it must be installed professionally in compliance with
the technical instructions applicable to the planning, construction and operation of the entire
system.
NOTE
Malfunctions caused by residues.
Proper functioning is not guaranteed.
Visually check that there are no metal filings or residues in the connections.
It is important that metal filings or other residues are blown out.
Tools
Install only with suitable tools.
With screw connections always use a second spanner to brace against the connection
nozzle.
Do not use unsuitable tools, such as pliers.
NOTE
Product damaged through incorrect installation direction
Proper functioning is not guaranteed.
Observe the installation direction (marked on the housing with an arrow
9. LEAK CHECK
Check the condition of the system:
• before initial start-up,
• after major changes,
• after repairs,
• after the system has been out of operation for more than one year.
Check the system with 1.1 x the operating pressure using air or an inert gas. The system is
leakproof if the test pressure does not drop after 10 minutes.
10. START-UP
NOTE
With the adjustable oil pressure regulators, the required outlet pressure has to be set.
Observe the permitted operating pressure of downstream fittings and consuming
devices.
Type
Adjust the outlet pressure by
ODRE
regulator cover
ODRE-M
T-screw
After installation and start-up, apply weather-sealing paint.
Part No. 13 504 50 e
Oil pressure regulator type ODR, ODR Bio, ODRE, ODRE-M
and scale
with display on the pressure gauge
1 m -17 m oil column
locking in place using the
Set screw
Locknut
)
5 / 6