Herunterladen Diese Seite drucken

Stahl 9419 Betriebsanleitung Seite 22

Bus-träger

Werbung

Verfügbare Sprachen

Verfügbare Sprachen

Installation
9.4 Mounting the ic Cover
The ic cover must be mounted before the auxiliary power and error message
cables are connected.
Place the ic cover over the connection terminals for the auxiliary power connection and
fasten it using the rivet.
10 Installation
Danger due to live parts!
Explosion protection is not guaranteed any longer.
In hazardous areas, connection work on the connection terminals and
attaching/removing the connection terminals are not permitted!
Before carrying out work on the connection terminals, the fieldbus and the
auxiliary power source of the bus-Carrier must be disconnected from the
supply.
Incorrectly installed components!
Explosion protection cannot be guaranteed any more if the components
are installed incorrectly.
Carry out the installation in strict accordance with the instructions and na-
tional safety and accident prevention regulations (e.g. IEC/EN 60079-14).
10.1 Removing the Insulation of the Fieldbus Connection Cable
Remove the insulation of the connection cable (1) according to the drawing.
Turn down the bare shield (2) according to the drawing.
Make sure that the cable diameter with the shield turned down does not exceed the
dimensions indicated on the drawing.
Remove the insulation of the conductors according to the drawing.
Make sure that the shield or the conductors are not damaged when removing the
insulation.
This procedure must be repeated for other connection cables.
8
bus-Carrier
9419
WARNING
WARNING
12578E00
200780 / 941960310010
2016-12-02·BA00·III·en·02

Werbung

loading