Herunterladen Inhalt Inhalt Diese Seite drucken

Installation; Preparation; Installation Tailpiece And Intermediate Flange - Vetus BOW2512E Installations- Und Benutzerhandbuch

Vorschau ausblenden Andere Handbücher für BOW2512E:
Inhaltsverzeichnis

Werbung

Verfügbare Sprachen
  • DE

Verfügbare Sprachen

  • DEUTSCH, seite 25
ENGLISH
5

Installation

In order to install the tunnel, consult chapter 4 'Installation recom-
mendations' .
For overall dimensions see drawing, page 106.
5.1

Preparation

The bow thruster will be delivered fully as-
sembled. Perform the following steps:
• Remove the propeller.
• Remove the motor from the intermediate
flange.
• Remove the intermediate flange from the
tail piece.
The 2 bushes are only required for trans-
port and are now no longer needed.
5.2

Installation tailpiece and intermediate flange

• Ensure that the plastic shim plate (1) has been positioned on the
tail piece.
• Place one packing (2) between the tail piece and the tunnel.
• Apply a sealant (e.g. polyurethane or silicone) between the tail
piece and packing, and between the packing and the tunnel wall.
• Place the tail piece in the hole in the tunnel.
Any extra packings used should be ones capable of justifying the
tail piece.
*) e.g. Sikaflex®-292.
• Grease the hole of the intermediate flange and position this
flange.
• Grease the threads of the bolts with 'outboard gear grease'*) be-
fore inserting and tightening them.
Check for possible leaks immediately the ship returns to wa-
ter.
*) A suitable grease is VETUS 'Shipping Grease' , Art. code: VSG.
20
020530.08
n
ote
The areas in which the electric motor of the bow thruster and
the battery are positioned must be dry and well ventilated.
2
1
Outboard Gear
Grease
vetus® Operation manual and installation instructions bow thruster BOW2512E
n
ote
M6
5
4 - 5 Nm
(3 - 3.7 ft.lbf )

Werbung

Inhaltsverzeichnis

Fehlerbehebung

loading

Inhaltsverzeichnis