Herunterladen Inhalt Inhalt Diese Seite drucken

Mitsubishi Electric CITY MULTI PEFY-P20VMA-E2 Installationshandbuch Seite 6

Inhaltsverzeichnis

Werbung

[Fig. 9.2.3]
B
D
1
S
M2
M1
N
L
[Fig. 9.3.1]
B
A
[Fig. 9.3.3]
G
F
F
Use PG bushing to keep the weight of the cable and external force from being ap-
plied to the power supply terminal connector. Use a cable tie to secure the cable.
Power source wiring
G
H
Use ordinary bushing
I
Transmission wiring
[Fig. 9.3.5]
M1
M2
B
C
[Fig. 9.5.1]
6
All manuals and user guides at all-guides.com
2
A
DC10~13V
C
A
B
1
2
Screw holding cover (1pc)
A
Cover
B
I
H
A
S
Terminal block
A
B
Round terminal
D
C
Shield wire
D
The earth wire from two cables are connected together to the S terminal. (Dead-end connection)
E
Insulation tape (To keep the earth wire of the shielded cable from coming in contact with the trans-
E
mission terminal)
SW11
<Indoor controller board>
9.2
[Fig. 9.2.4]
D
M1
DC24~30V
N
L
1 2
(A, B)
9.3
D
[Fig. 9.3.2]
E
[Fig. 9.3.4]
J
K
J
Terminal block for power source
K
Terminal block for indoor transmission
Terminal block for remote controller
L
9.5
SWC
SW5
SW12
SW14
SWA
B
2
1
S
M2
A
Non-polarized
A
B
TB15
Remote Controller
C
D
TB5
C
Terminal box
C
C
Knockout hole
D
E
Remove
L

Werbung

Inhaltsverzeichnis
loading

Inhaltsverzeichnis