Herunterladen Diese Seite drucken

Endress+Hauser Micropilot M FMR 231 Handbuch Seite 10

Austausch der stabantenne am füllstandsmessgerät
Vorschau ausblenden Andere Handbücher für Micropilot M FMR 231:

Werbung

Verfügbare Sprachen

Verfügbare Sprachen

KA551F/00/a2/01.07
Dismantling the rod antenna for FMR231
Ex i-devices: The repair has to be performed such, that the voltage resistance of the Ex ia circuits against ground is maintained.
0
2
1
Ex d-devices: Before assembly, the threads of the lids and the sensor module must be lubricated with acid-free grease.
E N
E N
D R
D R
M I
M I
E S
E S
O rd
O rd
C R
C R
S +
S +
e r
e r
O P
O P
H A
H A
S e
S e
C o
C o
r. -N
r. -N
d e :
d e :
I L O
I L O
U S
U S
o .:
o .:
T I
T I
E R
E R
I
I
M e
M e
s s b
s s b
M e
M e
e re
e re
a s u
a s u
ic h
ic h
ri n g
ri n g
ra n
ra n
g e
g e
U 1
U 1
m a
m a
6 .. .3
6 .. .3
x . 2
x . 2
4 .. .2
4 .. .2
6 V
6 V
0 m
0 m
0 m
0 m
D C
D C
A
A
I P
6 5
T
T
A
A
> 7 0
> 7 0
° C
° C
:
:
t > 8
t > 8
5 °C
5 °C
1
2
set
screw
(see text)
marker
with threaded boss
3
O-ring
4
0
2
1
Any repair on a certified device has to be documented!
This includes the device serial number, repair date, type of repair and name of the repair technician.
2
If required, a test can be performed with 500 Veff over a time period of 60 s.
Attention has to be paid not to damage the threads.
grounding spring
antenna cable
stop screw
(see text)
5
O-ring
antenna assembly
with flange
Order of disassembly with uninstalled instrument
and electronics removed
1
Loosen set screw at housing approximately one turn
(Allen wrench SW 4)
2
Unscrew stop screw in housing approximately 4 - 5 turns
(Allen wrench SW 2.5)
3
Twist complete antenna assembly out of housing
Attention!
4
PPS antenna only, the antenna
from the process connection.
If required, use wrench SW 22.
3
Assembly
Assembly of the antenna is done in opposite order.
Lubricate the O-ring (5) at the threaded boss or flange
with some silicone grease before the antenna
assembly is inserted into the housing.
Screw in stop screw (2) until stop, then loosen ½ to 1 turn.
Install electronics and all modules, observe proper
location of cables.
Install completely assembled device on tank and align
such, that the mark on the flange / threaded boss
points towards the tank wall
(see chapter "Alignment of installed device. . .").
Tighten set screw (1) firmly.
Align grounding spring such, that an electrical
connection is established to the process connection
(ground potential to antenna).
A new calibration of the Micropilot is required after any
exchange of .antenna.
The necessary steps are described in the chapter
"basic calibration. . .".
Exchange of rod antenna for FMR231
rod can be unscrewed
Endress+Hauser Maulburg

Werbung

loading