Herunterladen Inhalt Inhalt Diese Seite drucken

Unit Installation; Preparing The Gas Boiler Installation; Opening And Closing The Unit; To Open The Gas Boiler - Daikin Altherma EHYKOMB33AA Installations- Und Bedienungsanleitung

Hybrid-wärmepumpe – gasboilermodul
Vorschau ausblenden Andere Handbücher für Altherma EHYKOMB33AA:
Inhaltsverzeichnis

Werbung

Verfügbare Sprachen
  • DE

Verfügbare Sprachen

  • DEUTSCH, seite 46
Accessories Part number
EKGFP1289
EKGFP1299
INFORMATION
For extra configuration options regarding the flue gas
system, visit http://fluegas.daikin.eu/.
INFORMATION
For the installation of the flue and air supply duct material,
see the manual included with the materials. Contact the
manufacturer of the relevant flue and air supply duct
materials for extensive technical information and specific
assembly instructions.
9

Unit installation

9.1
Preparing the gas boiler
installation
Make sure that the hydrobox is already mounted to the wall.
It is recommended to first install:
▪ the water piping,
▪ the refrigerant piping,
▪ the electrical connection to the heat pump module.
EHYKOMB33AA
Daikin Altherma hybrid heat pump – gas boiler module
4P353067-1L – 2022.09
Description
Elbow PP/GALV 60/100 50°
Kit horizontal low profile PP/
GLV 60/100 (UK only)
9.2

Opening and closing the unit

9.2.1

To open the gas boiler

2
1 Open the display cover.
2 Unscrew both screws.
3 Tilt the front panel towards you and remove the front panel.
9.2.2
To open the switch box cover of the gas
boiler
1 Open the gas boiler, see "9.2.1 To open the gas boiler" [ 4  15].
2 Pull the boiler controller unit forwards. The boiler controller will
tip downwards to provide access.
9 Unit installation
2
1
Installation and operation manual
15

Werbung

Inhaltsverzeichnis
loading

Inhaltsverzeichnis