Herunterladen Inhalt Inhalt Diese Seite drucken

probst WEZ-06 Betriebsanleitung Seite 46

Vorschau ausblenden Andere Handbücher für WEZ-06:
Inhaltsverzeichnis

Werbung

Verfügbare Sprachen

Verfügbare Sprachen

Operation and Adjustment
When lifting, make sure that the changing
hook (1) can move freely.
Move the lifting eye to the "empty stroke
position" with the help of the carrier (e.g.
excavator).
53100438
1
Fig. 13
Fig. 15
18 / 22
Lift the device with the help of the carrier
(e.g. excavator) with the gripped L-stone (in
the area close to the ground). Then drive
slowly to the installation site and carefully
set down the L-stone.
When lifting the empty device (without L-
stone), the changing hook (1) must be
hooked in again (so that the rubber grippers
stay in opened (fixed) position).
Fig. 14
1
Fig. 16
GB

Werbung

Inhaltsverzeichnis
loading

Diese Anleitung auch für:

53100438

Inhaltsverzeichnis