Herunterladen Inhalt Inhalt Diese Seite drucken

Connection To An External Combustion Air Supply; Firing-/Instruction Manual; Initial Commissioning - Bullerjan B2 flex BOX Aufbau- Und Bedienungsanleitung

Inhaltsverzeichnis

Werbung

Verfügbare Sprachen

Verfügbare Sprachen

Value triple for the calculation of the
chimneys pursuant to EN 13384
Bullerjan B² flex
Unit
Tested nominal heat
output (NHO)
Exhaust gas mass
g/s
flow rate at NHO
Mean exhaust gas
°C
temperature
Delivery pressure
Pa
Mean CO
2
%
content
CO-content
mg/m
3
(13 % O
)
2
CO-content
Vol.-%
(13 % O
)
2
Dust (13 % O
)
mg/m
3
2
No x (13 % O
mg/m
3
2 )
%
Efficiency
Cleaning of the chimney: The chimney must be regularly
cleaned, by the master chimney sweep. This is normally
done once a year.

1.3.3 Connection to an external combustion air supply

The Bullerjan stoves B² flex have a connecting nozzle
for the supply of combustion air from outside of the
installation room. It's use can be mandatory in climate
controlled buildings with a controlled loading and venting
system.
1.4 Assembly/erection of the stove
The Bullerjan B² flex in the basic version with steel convection
panels is shipped to you fully assembled.
If you have opted for a version with ceramics, the covering
has to be attached on site. The relevant installation
instructions are included in the packaging of the stones/
ceramics. You can also download these instructions from
www.bullerjan.com.
Important: In order to prevent soiling of the materials, you
should always wear gloves when installing the ceramic
cladding.
5.0
When you have positioned your stove at the desired
place, after installing the covers of ceramcis only a few
more steps have to be taken:
4.11
223
– Use the integrated height adjusters in the pedestals in order
to ensure that the stove is leveled.
12
– Ensure that the connecting material is professionally installed,
10.47
so that the exhaust gases are fully discharged into the
chimney.
1172.9
– The combustion chamber of your stove is equipped with high-
quality vermiculite plates. Please make sure that these plates
0.094
have not shifted during transport and are flush on all sides.
36.9

2 Firing-/instruction manual

79.3

2.1.1 Initial commissioning

88
Please ensure that you followed the instructions as described
in section 1.4.
Burning-in: The Bullerjan stoves are coated with high-quality,
heat-resistant paint, which only reaches its completely solid
formation and odour nuisance during the first time the stove is
heating up. Please provide for adequate ventilation during this
process, by opening doors and windows.
This process should be completed after a maximum of five
hours of a fully burning fire.
Caution hot: During operation, the surfaces of the wood stove
are very hot! No contact must be made with the stove except at
the handle and the air-supply controller.
Although the door handle of the stoves is insulated, the heat -
ing of the door handle can only be delayed and not prevented.
Please use the provided glove to touch the handle of the stove,
when operational.
Important: The combustion chamber door must be kept
closed for safety reasons; exceptions are during ignition,
during refueling and in the cold state for ash removal.
18

Werbung

Inhaltsverzeichnis
loading

Inhaltsverzeichnis