14 - SERVICE INTERVALS
COMPONENT
Filters
Cooling coil
Electric heater (option)
Humidifier (option)*
Fan(s)
Electrics box
Hydraulic circuit
Water leak detection
sensor and relay
Filter pressure switch
Thermostat and fire control
relay
Valve
* If a water softener or water treatment system is used, the water hardness should not be less than 40% of the initial hardness and should never be less than 15°f.
15 - OPERATING READINGS
DATE/TIME
Rated voltage (V)
Voltage at terminals (V)
Fan motor absorbed current (A)
Mechanical inspection: tubes, fastenings,
etc.
Electrical connection tightness check
Clean the coil
Check the control
Check the filters
Check the sealing
16 - REGULATIONS
Declaration of Conformity UE
This unit complies with the provisions of European Directives:
- 2006/42/EC (Machinery)
- 2014/30/EU (EMC)
- 2011/65/EU (RoHS)
- Electronic Equipment Regulations 2012
- 2009/125/EC (Eco Design) et règlement 1253/2014/UE
- REGULATION (EC) No 1907/2006 (REACH)
This document is not legally binding. As part of its policy for continual product improvement, CIAT reserves the right to make any
technical modification it considers necessary without prior notice.
AT COMMISSIONING
- Check the connections
- Check the connections
- Check correct operation
- Check the connections
- Check correct operation
- Check correct operation and setpoint
adjustment
- Check correct operation
- Check circuit for correct operation and
leaks
2-3 MONTHS
- Replace
- Clean
- Clean
- Check the condition of the tank; replace
if necessary
- Check correct operation
- Check correct operation and setpoint
adjustment
- Check correct operation
UK Declaration of Conformity
This unit complies with the requirements of:
- Supply of Machinery (Safety) Regulations 2008
- Electromagnetic Compatibility Regulations 2016
- The Restriction of the Use of Certain Hazardous Substances
in Electrical and Electronic Equipment Regulations 2012
- The Ecodesign for Energy-Related Products and Energy
Information Regulations 2019, and following amendments
- UK REACH Regulations 2019
UK Importer:
- Toshiba Carrier UK Ltd, Porsham Close, Roborough,
Plymouth, PL6 7DB
EN-69
12 MONTHS
- Replace
- Check and clean the condensate drains
- Retighten the electrical connections
- Check the components
- Retighten the electrical connections
- Check the components
- Check the condensate drains
- Make sure that steam is evenly distributed
- Retighten the electrical connections
- Retighten the electrical connections
- Check the components
- Check the insulation
- Check correct operation
- Check correct operation and setpoint
adjustment
- Check correct operation