12.4. Electrical maintenance
As with any fixed electrical installation product, it is important to check the tightness at the
various connection points of the installation during the annual inspection. They must be in
phase with the following torques:
Tightening torques
2 N.m
circuit
breaker
CP/PP:
0.4 N.m
L1- L3/N/E:
1.2 N.m
Respect the tightening torque;
risk of electrical shock.
M3T2S assembly:
0.6 N.m
L/N/E:
0.8 N.m
CP/PP:
0.4 N.m
M2 assembly:
0.5N.m
43