Der eisblock gpx grafi kkartenkühler wird komplett montiert ausgeliefert. um ihre grafi kkarte einzusetzen, entfernen sie zunächst die schrauben und nehmen sie die backplate (plexi version) ab. (24 Seiten)
All manuals and user guides at all-guides.com Eisbecher 2 Aurora Glas Alphacool International GmbH V. 2.00–02.2021 Deutsch ..............................................Fehler! Textmarke nicht definiert. Sicherheitshinweise ........................................................ 4 Montagematerial ........................................................4 Montage Eisbecher 2 Aurora Glas ..................................................5 Towermontage: ........................................................6 Radiatormontage: ....................................................... 7 Anschluss Möglichkeiten: ....................................................
Seite 3
All manuals and user guides at all-guides.com Alphacool International GmbH Eisbecher 2 Aurora Glas avis général de sécurité ....................................................... 16 Matériel de Assemblée ......................................................16 Assemblée Eisbecher 2 Aurora Glass ................................................17 Assemblage de logements: ..................................................... 18 Montage de radiateurs: ....................................................19 Options de connexion: ....................................................
All manuals and user guides at all-guides.com Eisbecher 2 Aurora Glas Alphacool International GmbH Sicherheitshinweise Lesen Sie die Sicherheitshinweise, bevor Sie mit der Installation beginnen. Montagematerial Das Steigrohr 140mm liegt nur im Eisbecher Aurora 250mm bei. 4x M3x5 12x M4x8...
All manuals and user guides at all-guides.com Alphacool International GmbH Eisbecher 2 Aurora Glas Montage Eisbecher 2 Aurora Glas Haltermontage: Steigrohr Positionen: Entfernen Sie die Pumpe und Standhalterung, schrauben Sie die hier rot markierten Halterschrauben raus. Ziehen Sie den Deckel mit Gestänge und anschließend das Glasrohr vorsichtig heraus.
All manuals and user guides at all-guides.com Eisbecher 2 Aurora Glas Alphacool International GmbH Towermontage: Inlay Position: Achten Sie darauf, dass der Filter mit dem Inlay immer oben links positioniert ist. Nur in dieser Nutzen Sie dafür die vier M4x8 Schrauben in Verbindung mit den M4 Muttern. Je Position ist der Wasserfluss gewährleistet.
All manuals and user guides at all-guides.com Alphacool International GmbH Eisbecher 2 Aurora Glas Radiatormontage: Radiator Beispiel: 120-30 und 140-30 X-Flow. Bei diesem Beispiel brauchen die Verwenden Sie für die Radiatormontage die vier M3x5 Schrauben. Beachten Sie das Halter nicht gedreht werden.
All manuals and user guides at all-guides.com Eisbecher 2 Aurora Glas Alphacool International GmbH Anschluss Möglichkeiten: Fillport Fillport Wir empfehlen ausschließlich klare Kühlflüssigkeiten aus unserer eigenen Produktion (CKC, Tec Protect oder Eiswasser Crystal – kein UV“!) oder reines Verschlauchen Sie den Eisbecher nach Ihren Wünschen. Die Beispiele zeigen einige destiliertes bzw.
All manuals and user guides at all-guides.com Alphacool International GmbH Eisbecher 2 Aurora Glas aRGB Anschluss: Anschluss Eisbecher 2 Aurora Glas SATA Power Optional: Alphacool Aurora Eiscontrol (Art.-Nr. 15360)
All manuals and user guides at all-guides.com English Eisbecher 2 Aurora Glas Alphacool International GmbH English Safety Instructions Read the safety instructions before starting the installation. Assembly material The 140mm riser pipe is only included in the Eisbecher Aurora 250mm.
All manuals and user guides at all-guides.com Alphacool International GmbH Eisbecher 2 Aurora Glas English Assembly Eisbecher 2 Aurora Glas Bracket assembly: Rising pipe positions: Remove the pump and stand bracket, unscrew the holder screws marked in red. Carefully pull out the cover with linkage and then the glass tube. Replace the desired riser tube.
All manuals and user guides at all-guides.com English Eisbecher 2 Aurora Glas Alphacool International GmbH Tower assembly: Inlay Position: Make sure that the filter with the inlay is always positioned on the top left. Only in this position is the Use the four M4x8 screws in conjunction with the M4 nuts.
All manuals and user guides at all-guides.com Alphacool International GmbH Eisbecher 2 Aurora Glas English Radiator assembly: Radiator example: 120-30 and 140-30 X-Flow. In this example, the holders do not Use the four M3x5 screws for mounting the radiator. need to be rotated.
All manuals and user guides at all-guides.com Eisbecher 2 Aurora Glas Alphacool International GmbH Connection options: Fillport Fillport We recommend only clear cooling liquids from our own production (CKC, Tec Protect or Eiswasser Crystal - no UV"!) or pure distilled or osmosis filtered water Connect the tubing to the Reservoir as you wish.
All manuals and user guides at all-guides.com Alphacool International GmbH Eisbecher 2 Aurora Glas aRGB Connection: Connection Eisbecher 2 Aurora Glas SATA Power Optional: Alphacool Aurora Eiscontrol (item no. 15360)
All manuals and user guides at all-guides.com Français Eisbecher 2 Aurora Glas Alphacool International GmbH Français avis général de sécurité Lisez les instructions de sécurité avant de commencer l‘installation. Matériel de Assemblée La tube montante de 140 mm est uniquement incluse dans le Eisbecher Aurora de 250 mm.
All manuals and user guides at all-guides.com Alphacool International GmbH Eisbecher 2 Aurora Glas Français Assemblée Eisbecher 2 Aurora Glass Montage du support: Positions de la colonne montante: Retirez la pompe et les pieds, dévissez les vis marquées en rouge ici.
All manuals and user guides at all-guides.com Français Eisbecher 2 Aurora Glas Alphacool International GmbH Assemblage de logements: Position d'incrustation: Veillez à ce que le filtre avec l'incrustation soit toujours placé en haut à gauche. Ce n'est que dans Utilisez les quatre vis M4x8 en conjonction avec les écrous M4. Selon le type de cette position que le débit d'eau est garanti.
All manuals and user guides at all-guides.com Alphacool International GmbH Eisbecher 2 Aurora Glas Français Montage de radiateurs: Exemple de radiateur: 120-30 et 140-30 X-Flow. Dans cet exemple, les supports Utilisez les quatre vis M3x5 pour le montage du radiateur. Veuillez noter qu'en n'ont pas besoin d'être tournés.
All manuals and user guides at all-guides.com Français Eisbecher 2 Aurora Glas Alphacool International GmbH Options de connexion: Fillport Fillport Nous ne recommandons que des liquides de refroidissement clairs issus de notre propre production (CKC, Tec Protect ou Eiswasser Crystal - pas d'UV" !) ou de Préparez le Eisbecher selon vos souhaits.
All manuals and user guides at all-guides.com Alphacool International GmbH Eisbecher 2 Aurora Glas Français Connexion aRGB: Connexion Eisbecher 2 Aurora Plexi SATA Power Optionnel : Alphacool Aurora Eiscontrol (point n° 15360)
Seite 22
All manuals and user guides at all-guides.com Français Eisbecher 2 Aurora Glas Alphacool International GmbH Imprint: Alphacool International GmbH Marienberger Str. 1 38122 Braunschweig Support: +49 (0) 531 28874 – 0 Fax: +49 (0) 531 28874 – 22 E-Mail: info@alphacool.com General Managers: Andreas Rudnicki, Nathanael Draht, Fabian Noelte WEEE-Reg.-Nr.: DE 544444...