Herunterladen Inhalt Inhalt Diese Seite drucken

Installation; Typical Installation: Over-Sink Installation M/Smb; Installation Instructions - clage M 3 7-O Serie Gebrauchs- Und Montageanleitung

Inhaltsverzeichnis

Werbung

Verfügbare Sprachen
  • DE

Verfügbare Sprachen

  • DEUTSCH, seite 1
M 3...7-O

Installation

2. Installation
Installation, initial operation and maintenance of this appliance must only be conducted by an authorised
professional, who will then be responsible for adherence to applicable standards and installation regulations. We
EN
assume no liability for any damages caused by failure to observe these instructions!

2.1 Typical installation: over-sink installation M/SMB

"Installation diagram with SMB tap" (dimensions in mm)

2.2 Installation instructions

The heater is installed directly on the SMB or SME special tap. We guarantee trouble-free operation of the instan-
taneous water heater only if CLAGE fittings and accessories are used. Note the following during installation:
• Installation must comply with DIN VDE 0100 and EN 806 and with the statutory regulations of the country and
the provisions of the local electricity and water supply company.
• Check the technical data and information on the rating plate.
• Easy access to the instantaneous water heater must be guaranteed at all times for maintenance purposes. An
separate shut-off valve must be installed.
• Only use the appliance with an open-outlet tap.
• Ensure that all accessories are removed from the packaging.
• The water pipe must be securely embedded in the wall and it must be stable.
• The minimum requirements for the required water resistance must be complied with. The required water
resistance of the can be obtained from your water supply company.
• The minimum requirements for the required water resistance must be complied with. The required water
resistance of the can be obtained from your water supply company.
20

Werbung

Inhaltsverzeichnis
loading

Inhaltsverzeichnis