Herunterladen Inhalt Inhalt Diese Seite drucken

FP FPi 1000 Serie Betriebsanleitung Seite 138

Inhaltsverzeichnis

Werbung

Verfügbare Sprachen

Verfügbare Sprachen

Operator's Manual FPi 1000 series
138
Insert feeder plug.
Drop feeder into position and click into
place.
Plug
Caution! If transporting the FPi 1000 from a
cold environment to a new location, note the
following: Wait for at least two hours before
putting the FPi 1000 back into service to give
the machine time to adapt to the given room
temperature and for any condensation within
the machine to evaporate.Connection and
testing
Warning! Make sure the mains supply
conforms to power requirements shown on the
machine's serial number plate. Ensure that the
machine is connected to an earthed mains
socket with protected contacts.
Fill water tank. (See chapter 9.1.)
Insert mains plug into power supply socket.
Perform test runs on all feeders.

Werbung

Inhaltsverzeichnis
loading

Inhaltsverzeichnis