Herunterladen Inhalt Inhalt Diese Seite drucken

Winter Lay-Up - Vetus GHS4 Bedieningshandleiding

Generator sets 4 - 24 kva 3000 1/min 50 hz 6.5 - 25 kva 1500 1/min 50 hz
Inhaltsverzeichnis

Werbung

Verfügbare Sprachen
  • DE

Verfügbare Sprachen

  • DEUTSCH, seite 66
Preparation for Winter
Preparation for Summer
Preparation for Winter
Consult the separate engine Manual for taking it out of service
for the winter.
It is not necessary to carry out any specific work on the generator
at the start of the winter lay-up.
Preparation for Summer
Consult the separate engine Manual for preparation for use
again at the start of the summer cruising season.
GHS4, GHS14, GHS24, GLS6.5, GLS14 and GLS25:
It is not necessary to carry out any specific work on the generator
to prepare it for operation again.
GHS6.5 and GHS8:
Check the slip rings for possible corrosion, sand them clean if
necessary. for this, use very fine 400 - 500 Grade) sanding cloth.
further specific work is not required at the start of the cruising
season.

Winter Lay-up

5
6

Werbung

Inhaltsverzeichnis
loading

Verwandte Produkte für Vetus GHS4

Inhaltsverzeichnis