S5 – Maintenance and do-it-yourself
8.15 Maintenance table
If your machine is used for wet machining, additional maintenance is required that is not listed in this table.
The maintenance tasks are described in the operating instructions for the vhf wet grinding module.
The operating instructions are delivered with the vhf wet grinding module. They are also available for down-
load at: https://www.dentalportal.info/NO1
Several times per day
Task
Checking the external compressed
air lines for damage
Checking the suction hose for
damage
Once per day
Task
Checking the compressed air regu-
lator
(
)
page 48
Daily cleaning of the working
chamber
(
)
page 44
Once per week
Task
Cleaning the collet chuck
(
)
page 46
Cleaning the blank magazine
(
)
page 45
When necessary
Task
Updating the software and firm-
ware
(
)
page 52
Cleaning the housing
(
)
page 49
Exchanging the main fuse
(
)
page 50
Recommended interval
Before switching on the
machine
Before switching on the
machine
Recommended interval
Before work
Clean or exchange cartridge
in case of visible contam-
ination or every 2 years
After work
If soiled
Recommended interval
Once per week
In case of rotational imper-
fections
Once per week
If soiled
Recommended interval
When an update is available
Original Operating Instructions: S5
Version: 12/15/2021
Procedure / Parts
Visual check
Visual check
Procedure / Parts
If necessary, new filter cart-
ridge
Vacuum cleaner, Brush, Dry
cloth
Procedure / Parts
Spindle service set
Wet cloth, Dry cloth
Procedure / Parts
Microfiber cloth, Water, Mild
cleaning agent (optional)
Replacement fuse T6,3A
L250V
EN 53
Tool illustration
Tool illustration
Tool illustration
Spare part illustration