Mount Gateway
The mounting adapter now becomes part of the sensor. To remove the sensor from
the measurement location for purposes of changing the batteries, the screw mounting
adapter must be unscrewed from the measurement location.
The defined maximum torque must be used to screw back the screw mounting
adapter on the measurement location.
If the adhesive mounting adapter is used, then the bond of the adhesive must be
broken by carefully turning the adapter with the specially designed adapter wrench.
Once the adapter and sensor are broken free from the machine surface, remove
residual adhesive from the adapter surface using a grinding wheel or a file.
Mount the Gateway
NOTE: Mounting can be done before or after configuring the gateway, but
configuration prior to installation is recommended. For more information about
configuring the gateway, refer to LIVE-Asset™ Portal online help.
The gateway must be installed by knowledgeable, skilled persons familiar with
electrical regulations.
The gateway must be installed at an exposed position with a guaranteed source of
power. Gateways should be installed with a maximum distance of 100 m (direct line
of sight) from the configured sensors. The gateway must not in any way interfere with
plant operation.
35