Adhesive (to mount sensor to adapter) — recommended adhesives:
LOCTITE 330; WEICON HD 300; UHU PLUS SCHNELLFEST (UHU QUICKSET)
Grinding wheel
Steps
1. Select location to install the sensor.
Choose the best possible location that ensures that horizontal, vertical and axial
movements are measured effectively.
Leave at least 40 mm (1 37/64") clearance between the stud mounting hole and
any corners or walls to allow access for the wrench used to tighten the mounting
adapter into place.
2. Use a grinding wheel to remove coatings such as paint from an area at least
25 mm ( 63/64") diameter at the mounting location. This prepares the machine
surface for mounting the adapter.
3. Drill the pilot hole. Use a 3.5 mm (1/8") drill bit with depth gauge.
The hole must be at least 10 mm (7/16") deep for the mounting adapter to seat
firmly into place.
Permannet Mounting of Gateways and Sensors
29