Herunterladen Inhalt Inhalt Diese Seite drucken

Cable Routing - Balluff BNI EIP-508-105-Z067 Montageanleitung

Vorschau ausblenden Andere Handbücher für BNI EIP-508-105-Z067:
Inhaltsverzeichnis

Werbung

Verfügbare Sprachen

Verfügbare Sprachen

BNI EIP-508-105-Z067
Network interface
Electrical connection (continued)
PROFINET interface
Top view of M12 socket, D-coded
Pin
Signal
Description
1
Tx+
Transmit Data +
2
Rx+
Receive Data +
3
Tx−
Transmit Data −
4
Rx−
Receive Data −
I/O-Port
Top view of M12 socket
Pin
1
+24 V, 2 A
2
Input / Output (1 A / 2 A / 4 A)
3
GND
4
Input / Output (1 A / 2 A) / IO-Link
5
n.a.
Configurable to 1 A, 2 A and 4 A, taking into consideration the
1)
total current of 16 A and the max. total current of 4 A on the GND
pin of the port
For the digital sensor inputs, see the directive on
inputs EN 61131-2, type 3.
Due to the high power at the 4 A outputs, high
short-circuit currents may occur and must be
taken into account accordingly in the application
and fusing. The total current of the outputs must
not exceed the total current of the module of 16 A.
4
english
Signal
1)
Electrical connection (continued)
Unused ports must be covered with caps to
ensure IP67 protection.
Grounding
The FE connection between the housing and the
machine must have a low impedance and be as
short as possible.
► Use the grounding strap included in the scope
of delivery.

Cable routing

Cable length
The Ethernet cable may be max. 100 meters long.
The IO-Link single-ended cordset may be max. 20 meters
long.
To counteract EMC
interference, the functional
earth connection must be
used.
► Connect the earth
terminal to the
functional earth (FE) of
the machine.

Werbung

Inhaltsverzeichnis
loading

Inhaltsverzeichnis