Herunterladen Inhalt Inhalt Diese Seite drucken

Peak-Load Negotiation (Optional); Machine Data; Fixing Options; Fixing Without Plinth - Miele PDR 918 EL Installationsplan

Elektrobeheizt gewerbliche trockner
Inhaltsverzeichnis

Werbung

Peak-load negotiation (optional)

Supply voltage for control contacts
Minimum cross-section for connection cable
Miele recommends using a flexible connection cable with an additional isolation option to establish the connection. The isolator should
remain visible once the tumble dryer has been installed and must be freely accessible.

Machine data

Machine width, total
Machine height, total
Machine depth, total
Niche width
Recommended wall spacing (up to the front edge of the machine)
Minimum wall spacing (up to the back edge of the lid)
Packaging width
Packaging height
Packaging depth
Maximum gross volume
Maximum gross weight
Maximum net weight
Max. floor load in operation
Diameter of exhaust duct
Drum diameter
Diameter of drum opening
Drum depth
Drum volume
Diameter of door opening
Maximum door opening angle
Emission sound pressure level
Sound power level
Average heat dissipation rate into the room
Permissible ambient temperature range

Fixing options

Fixing without plinth

Tensioning strips
Wood screws DIN 571 (Ø × length)
Plugs (Ø × length)
If the tumble dryer is being installed without a plinth, fixing it in place is recommended.
Fastenings for floating screed must be supplied by the customer on site.
en - Technical data
50 dB(A) re 20 µPa
Quantity
2
2
2
AC 230 V
5×1.5 mm²
906 mm
1400 mm
1035 mm
1250 mm
1500 mm
500 mm
1090 mm
1526 mm
1125 mm
1871.3 l
187.3 kg
173.5 kg
1967 N
150 mm
850 mm
520 mm
613 mm
325 l
520 mm
180°
60
4.5 MJ/h
2–40 °C
Screw size
6×40 mm
10×50 mm
21

Werbung

Inhaltsverzeichnis
loading

Diese Anleitung auch für:

Pdr 518 elPdr 518 ropPdr 518 rop elPdr 918 ropPdr 918 rop el

Inhaltsverzeichnis