4. Allow 15 cm clearance at rear and sides for
proper air circulation and ease of maintenance
and/or service should they be required. Allow
60 cm clearance on top to allow for removal
of the Auger.
5. This appliance is not suitable for installation
in an area where a water jet could be used
and where dripping is not allowed.
6. Do not place anything on top of the icemaker
or in front of the Louver.
3. INSTALLATION
* This icemaker requires refrigeration, power, water
and drainage connections (sections 3, 4 and 5 of
this manual). DO NOT attempt to start this unit
until all connections/services are connected.
* Incorrect installation can cause harm to people,
animals or things, for which the manufacturer cannot
be held responsible.
1) Fully screw in the four legs provided (bin
accessory) into the Storage Bin underside. See
Fig. 2.
Bottom Plate
Adjustable Legs
2) Position the Storage Bin in the selected permanent
site.
3) Place the icemaker on top of the Storage Bin by
holding the bottom.
4) Secure the icemaker to the Storage Bin, by using
the two mounting brackets and two bolts provided.
See Fig. 3.
Icemaker
Bin
Bolt
Mounting
Bracket
5) Seal the seam between the icemaker and the
Storage Bin with food grade sealant.
6) Refit the Side Panels in their correct position.
7) Adjust the four legs on the bottom (adjustable from
0 to 25.4 mm) to have the icemaker perfectly
horizontal. Use the spirit level. See Fig. 4.
8) The icemaker must be connected to the liquid
and suction lines of the main pipework system
using two copper tubes of sufficient lengths and
sizes directed to the rear of the icemaker for
connection to the pre-fitted internal copper tubes.
Both tubes should be insulated separately.
Note: Sizes for the interconnecting pipes from
Fig. 2
9) Remove the Metal Cap from the Ball Valve, and
open the valve. See Fig. 5.
Note: The unit is precharged with nitrogen gas.
Fig. 3
2
Adjust legs
the icemaker to the main system should
be 3/8" OD for the liquid line and 5/8" OD
for the suction line up to a maximum length
of 20 m. If exceeding this length of run,
increase pipe sizes to 1/2" liquid line and
3/4" suction line.
Adjustable
Close - Clockwise
Open - Counterclockwise
Metal Cap
Fig. 5
Fig. 4