A. Attach the end of 3890MM lower cable(136#) through the opening of the leg developer,Place 1 pc pulley onto the
cable, Secure it with 1PC M10X60 Allen bolt (102#),2pcs bushing (42#) and 1pc M10 Aircraft nut (103#).
B. Draw the cable backwards,place 1pc pulley onto the cable, secure it with 1PC M10X65 Allen bolt (93#),2pcs bushing
(41#) and 1pc M10 Aircraft nut (103#).
C.Draw the cable backwards, place 1 pc pulley onto the cable, Secure the pulley with 1PC M10X45 Allen bolt
(94#),2pcs Ø10 washer (105#) and 1pc M10 Aircraft nut (103#).
D. Draw the cable around the pulley and upwards,Place 1 pc pulley onto the cable,Secure it with 1pc M10*50 Alllen bolt
(95#),2pcs Ø10 washer (105#) ,2pcs bushing (44#),2pcs cable retainer (43#) and 1 pc M10*65 Aircraft nut (93#).
E. Draw the cable around the pulley and downwards,Place 1 pc pulley onto the cable,Secure it with the same way in C.
F.Draw the cable around the pulley and upwards,Place 1 pc pulley below the cable,Secure it with the double floating
pulley bracket with the same way in STEP 14 E.
G. Draw the cable around the pulley and downwards, place 1pc pulley onto the cable,Secure it with 1 pc M10*45 Allen
bolt (94#),2pcs Ø10 washer (105#) and 1pc M10 Aircraft nut (103#).
H. Draw the cable around the pulley and upwards and reach the opening of the front vertical frame,Place 1 pc pulley
below the cable and secure it with the same way in B.
77