INSTALLATION
WARNING: VMF-E2 / E2Zis designed for
indoor use.
WARNING: check that the power supply
is disconnected before carrying out any
procedures on the unit.
WARNING: before carrying out any work,
put the proper individual protection
equipment on.
WARNING: the device must be installed
in compliance with national plant
engineering rules.
WARNING: the electrical connections, plus
the installation of fan coils and relevant
accessories, should only be performed by
- Loosen the screws to remove the housing.
- Fit the panel (see figure).
FCX
FCZ
ELECTRICAL WIRINGS
For all the connections, follow the
wiring diagrams.
The connections must be made with the
connectors on the electronic card on
12
AVMFE2 1606 - 6795750_01
a technician with the necessary technical
and professional expertise to install,
modify, extend and maintain systems,
and who is able to check the systems for
purposes of safety and correct operation
(in this manual such technicians will be
indicated with the general term "personnel
with specific technical skills").
In the specific case of electrical wirings, the
following must be checked:
- measurement of the electrical system
insulation strength.
- continuity of the protection wires
WARNING: Install a device, main
- Make all the connections.
- Reassemble the casing.
the side of the fan coil (protected by a
plastic box).
WARNING: the diagram showing
switch, or electric plug so you can fully
disconnect the device from the power
supply.
The essential indications to install the
device correctly are given here.
The installer's experience will be necessary
however, to perfect all the operations in
accordance with the specific requirements.
The assembly site must be chosen in such
a way that the maximum and minimum
ambient temperature limits are respected
0-45°C (<85% R.H.).
- Make sure the fan coil is working properly.
the connections of the electronic
card to the control board is printed
inside its box cover.