Herunterladen Inhalt Inhalt Diese Seite drucken

Unpacking The Machine - ATH-Heinl Pure Lift 2.40 Bedienungsanleitung

Inhaltsverzeichnis

Werbung

Verfügbare Sprachen

Verfügbare Sprachen

2.0
INSTALLATION
The machine must be installed by an authorised person according to the instructions.
The operating instructions (including the log) are an important part
The product must be checked after completion of the installation, handover, if necessary briefing and then
regularly in accordance with the applicable regulations and legal provisions in the country of operation by a
suitable and approved company or facility.
2.1
Transport & Storage Conditions
When transporting and positioning the machine, always use suitable lifting and material handling
equipment and consider the machine's centre of gravity.
The machine should only be transported with the original packaging.
Data:
Width
Length
Height
Storage temperature
2.2

Unpacking the machine

Remove the top cover of the packaging and make sure that no damage has occurred
during transport.
Remove the safety bolt to remove the machine from the pallet / rack.
Use a suitable lifting device (possibly with a stopping rope) to lower the machine from the
pallet / frame.
The packaging material used for the machine should be stored carefully.
Keep the packaging material out of the reach of children as it may be hazardous.
® Urheberrecht ATH-Heinl GmbH & CO.KG, Alle Rechte vorbehalten / Druckfehler und technische Änderungen vorbehalten / Stand: 2021-08
of the machine / product.
!!!PLEASE STORE CAREFULLY!!!
----
----
----
----
-10 bis +50 °C
Produkthersteller ATH-Heinl GmbH & CO.KG
- 9 -

Werbung

Inhaltsverzeichnis
loading

Inhaltsverzeichnis