Herunterladen Inhalt Inhalt Diese Seite drucken

Recommended Minimum Distance For; Installation - Vaillant atmoCRAFT VK 654/9 Installations- Und Wartungsanleitung

Vorschau ausblenden Andere Handbücher für atmoCRAFT VK 654/9:
Inhaltsverzeichnis

Werbung

Verfügbare Sprachen

Verfügbare Sprachen

4 Assembly
4.3

Recommended minimum distance for

installation

2200
500
A
Fig. 4.3 Minimum clearances
When installing the boiler, the minimum clearances
shown in Fig. 4.3 must be maintained to ensure
unhindered access to the boiler.
The height of the boiler room should be at least
2200 mm (also with VKM). The side clearances and the
clearance in front of the unit shown in the drawing are
for maintenance purposes.
Note!
Please bear in mind that, when installing a free-
standing boiler, there is adequate free space on
both sides (min. 500 mm) for the installation
process.
Boiler Type
65 kW
75 kW
85 kW
105 kW
115 kW
130 kW
150 kW
165 kW
Table 4.3 Dimensions (measurements in mm)
12
100
B
500
1000
A
B
850
930
1010
1170
1060
1250
1410
1570
1730
1112
Installation and maintenance manual atmoCRAFT

Werbung

Kapitel

Inhaltsverzeichnis
loading

Diese Anleitung auch für:

Atmocraft vk 1654/9

Inhaltsverzeichnis