Commissioning (first use)
11.
Risk of fire! Always make sure
before switching the sauna heater that
no objects were forgotten on the safety
grill.
• Switch on the control unit.
• Select the appropriate operation mode
(settings).
• By the first heat-up an unpleasant odour
of burned lubricants may appear. This is
normal and will only take place by the
first heating. Ventilate the sauna properly.
By later use no such unpleasant odours
shall occur
Troubleshooting
12.
Problem: Heater does not heat or doesn't
heat properly.
Reason: One or several heating element
are faulty.
Help: Replace faulty elements (only through
a qualified specialist).
All manuals and user guides at all-guides.com
13. Replacement of heating elements
13.1 Preparation
1. Disconnect the heater from power.
2. Gain access to heater.
3. Remove the deflector cover (1) (4 screws).
4. Remove the cover of the terminal box
(8) (4 screws).
5. Lift up and remove the gutter (2).
6. Remove the sauna rocks.
7. Remove the support (3) (2 screws).
13.2 Remove the upper heating element
Notice: Always remove the upper heating
element (4).
10. Pull off the cable contacts from the
heating elements.
11. Undo the fixation nut of the heating
element
12. Pull the heating element inwards and
take it out.
13.3 Removing other heating elements
13. Remove the rocks store (7)
14. Repeat steps 10-12 for the respective
heating elements.
13.4 Installing heating elements
12. Insert a new heating element into po-
sition in reverse order.
13. Fasten each heating element with the
fixation nut.
14. Insert the rock store (7) back into posi-
tion before mounting the upper heating
element.
15. Restore the electrical connections to
the heating elements.

13.5 Final steps

16. Mount the support (3) to the rock store
(7) (2 screws).
17. Fill the sauna rocks into the store.
18. Mount the gutter (2).
19. Install the terminal box cover (8) (4
screws)
20. Mount the deflector cover (1) (4 screws).
21. Restore the power supply to heater.